ABB Electrification (Thomas and Betts) 58171UB12

ABB Electrification (Thomas and Betts) 58171UB12 electronic component

Image shown is a representation only

Manufacturer No
58171UB12
Packaging
Bulk
Description
300 WELD CU STD BARREL, 3/4IN BH
Detailed Description
Terminal Connector Rectangular Lug, Grounding 300MCM (kcmil) 3/4 Stud
Datasheet
ISO 13485 certification
ISO 14001 certification
Five-Star Service certification
UKAS management certification
IAF recognition arrangement certification
Color
Red
Packaging
Bulk
Insulation
Non-Insulated
Wire Gauge
300MCM (kcmil)
Termination
Crimp, Barrel
Manufacturer
ABB Electrification (Thomas and Betts)
Mounting Type
Free Hanging (In-Line), Right Angle
Stud/Tab Size
3/4 Stud
Terminal Type
Lug, Grounding
Contact Finish
Tin
Terminal Style
Single Stud Hole
Contact Material
Copper
Diameter - Ring ID
0.750" (19.05mm)
AttributeValue
ColorRed
PackagingBulk
InsulationNon-Insulated
Wire Gauge300MCM (kcmil)
TerminationCrimp, Barrel
ManufacturerABB Electrification (Thomas and Betts)
Mounting TypeFree Hanging (In-Line), Right Angle
Stud/Tab Size3/4 Stud
Terminal TypeLug, Grounding
Contact FinishTin
Terminal StyleSingle Stud Hole
Contact MaterialCopper
Diameter - Ring ID0.750" (19.05mm)

Purchase & Inquiry

Placing an Order

You may place an order on DAXIN without creating an account.

Available Payment Methods

For your convenience, we accept several payment methods in USD, including PayPal, credit card, and wire transfer.

RFQ (Request for Quote)

We recommend submitting an RFQ to receive the latest pricing and inventory information for the parts you need.

Our sales team will respond to your request by email within 24 hours.

Important Notes

1. You will receive an order information email in your inbox. Please check your spam folder if you do not find the email.

2. Since inventory and pricing may change from time to time, our sales manager will reconfirm your order and notify you if any updates are needed.

Payment Method

Transaction fee is charged according to bank/payment system rules.

Shipping Method

Shipped from
Hongkong/Shenzhen warehouse
Estimated Ship Date
Oct 3, 2026 - Oct 4, 2026
Shipping Fee
Calculated based on your destination

Packages

Product before packing

Step1: Product

Product in anti-static bag

Step2: Anti StaticBag

Product in individual packaging

Step3: Individual Packaging

Individual packaging box

Step4: Packaging Boxes

Packaging box with shipping label

Step5: Bar-Code Shipping Tags

Shipping by cargo vessel

Step6: Shipping